Somerset Larder

Client
Location
Hinkley Point C (High-Security Nuclear Power Plant Site), Somerset
Sector
Long-Term Hire – Cold Storage Units (Reefers, Trailers, Monitoring)
Solution
Long-term, large-scale cold storage was needed on a secure construction site, but it had to be flexible to meet changing needs
Blocks of iceBlocks of iceBlocks of ice
Blocks of ice

Blocks of ice
Blocks of ice

The Customer

Somerset Larder provides catering services to major infrastructure projects across the Southwest, including some of the most secure environments in the UK. At Hinkley Point C, one of Europe’s largest nuclear construction sites, they are responsible for delivering daily catering to thousands of workers around the clock.

The Challenge

With a large-scale, 24/7 operation, Somerset Larder required dependable, high-capacity cold storage that could operate long-term under high-security site restrictions. They needed a solution to meet growing catering demands while maintaining food safety and operational resilience over several years.

Given the strict security protocols at Hinkley Point C, the cold storage solution needed to meet site access requirements, have full remote monitoring capabilities and integrate smoothly with Somerset Larder's logistics and service teams.

Five stars
A banner saying "why we do it"

The Solution

Long-term, large-scale cold storage was needed on a secure construction site, but it had to be flexible to meet changing needs

The Outcomes

The long-term cold storage solution we provided allows Somerset Larder to maintain uninterrupted food service across one of the UK’s most demanding construction environments. Our support has enabled them to:

  • Maintain safe, regulated cold storage for perishable food across multiple zones of the site
  • Scale capacity up or down based on workforce demand and seasonal changes
  • Receive instant alerts and performance data through remote temperature monitoring
  • Operate confidently within a highly secure nuclear site, with full compliance and minimal disruption
  • Ensure catering continuity for thousands of workers, contributing to the smooth progress of a nationally significant infrastructure project

Our partnership with Somerset Larder continues to evolve, with ongoing support as Hinkley Point C moves through its next phases of construction.

We worked closely with Somerset Larder’s logistics and compliance teams to ensure every delivery, installation, and service visit followed nuclear site protocols — including security vetting, scheduled access windows, and tamper-proof unit configurations.

"The delivery, setup, and support were incredibly professional. With the extra fridge and freezer space, we finally stopped playing Tetris with our inventory, it’s made day-to-day so much easier and supported the demand.” Transport Manager

What solution do I need?

Find out the best solution for your needs based on a few simple questions

A polar bear doing a thumbs up.
Blocks of iceA block of ice
Blocks of iceBlocks of iceBlocks of ice
Blocks of ice

Blocks of ice
Blocks of ice